Site Logo Delaware Health and Social Services

    ARRA Projects

    ARRA Projects

    City of Wilmington
    Installation of solar panels at the Wilmington Porter Plant Water Treatment Facility.

    Back – Wilmington
    Driving the pilings to support the solar array.

    Back – Wilmington
    Pilings awaiting installation of solar panels.

    Back – Wilmington
    The solar panels will provide energy for the Wilmington Porter Plant Water Treatment Facility.

    Back – Wilmington
    Installed solar panels.

    Back – Wilmington
    Area view of the support structure for the solar array at the Wilmington Porter Plant Water Treatment Facility.

    Back – Wilmington
    All solar panels installed at the Wilmington Porter Plant Water Treatment Facility.

    Back – Wilmington
    Town of Greenwood
    Greenwood Well Improvements.

    Back – Greenwood
    Greenwood Project Sign.

    Back – Greenwood
    Well awaiting construction of the new treatment plant.

    Back – Greenwood
    Slab that will be the base of the new treatment plant.

    Back – Greenwood
    New treatment plant constructed March 2010 in Greenwood.

    Back – Greenwood
    New treatment plant constructed in Greenwood.

    Back – Greenwood
    New treatment plant building.

    Back – Greenwood
    Components of the new treatment system.

    Back – Greenwood
    Part of the new treatment system in Greenwood.

    Back – Greenwood
    Control panel for the new treatment system.

    Back – Greenwood
    Secondary containment for NSF approved disinfection.

    Back – Greenwood
    Secondary containment for chemicals used during the treatment process.

    Back – Greenwood
    PVC Used during the project in Greenwood.

    Back – Greenwood
    Meter pits for the Greenwood project were made in Napoleon, Ohio.

    Back – Greenwood
    170 meter pits were brought in for the project.

    Back – Greenwood
    Meter pit prior to installation.

    Back – Greenwood
    Meter ready for installation.

    Back – Greenwood
    City of Smyrna
    Project signs announce the Monrovia Valves Project.

    Back – Smyrna
    Valve installed during the Monrovia Valves Project.

    Back – Smyrna
    Equipment that was used during valve installation to avoid disruption of service.

    Back – Smyrna
    Sign announcing the Belmont to Sunnyside Road Main Replacement.

    Back – Smyrna
    Sign announcing the Glenwood Development Water Services Replacement

    Back – Smyrna
    Water Main Replacement.

    Back – Smyrna
    Working on the water main replacement in Glenwood.

    Back – Smyrna
    Connecting to the new water main.

    Back – Smyrna
    Excavating the old water main in Glenwood.

    Back – Smyrna
    Water Main Replacement in Glenwood.

    Back – Smyrna
    Connecting to the new water main.

    Back – Smyrna
    Connecting to the new water main.

    Back – Smyrna
    Work area of the Route 13 main replacement in Smyrna.

    Back – Smyrna
    Sign announcing the Route 13 water main replacement.

    Back – Smyrna
    Replacing the water main along Route 13.

    Back – Smyrna
    Working on replacing a water main in Smyrna.

    Back – Smyrna
    Town of Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Construction of the new treatment plant and clear well in the Town of Millsboro.

    Back – Millsboro
    Chlorine room inside the new treatment plant in Millsboro.

    Back – Millsboro
    Chemical feed equipment in the new Millsboro treatment plant.

    Back – Millsboro
    Control panels in the new treatment plant.

    Back – Millsboro
    Process flow piping in the new treatment plant.

    Back – Millsboro
    Equipment in the new Millsboro treatment plant.

    Back – Millsboro
    Turbine pumps in the new treatment plant.

    Back – Millsboro
    Lime feed for pH adjustment.

    Back – Millsboro
    City of Seaford
    Sign announcing ARRA project in Seaford.

    Back – Seaford
    Main replacement on Oak Road.

    Back – Seaford
    Construction materials staged for water main replacement in Seaford.

    Back – Seaford
    Work area of the water main replacements in Smyrna.

    Back – Seaford
    Working on the main replacement in Seaford.

    Back – Seaford
    Replacing the water main in Seaford.

    Back – Seaford
    New manhole cover installed during the Seaford project.

    Back – Seaford
    Road marked for main upgrades to be done in April.

    Back – Seaford
    Recently completed service upgrade in Seaford.

    Back – Seaford
    New meter pit installed as part of the Seaford project.

    Back – Seaford
    Recent main upgrades waiting for road repair.

    Back – Seaford
    Main replacement on Oak Road.

    Back – Seaford
    Recently replaced service line.

    Back – Seaford
    Preparation for new service line.

    Back – Seaford
    Old service line to be replaced.

    Back – Seaford
    Lead gooseneck to be replaced.

    Back – Seaford
    Meter pits for the project were made in Murfreesboro, TN.

    Back – Seaford
    New meter pit.

    Back – Seaford
    Interior view of new meter pit.

    Back – Seaford
    New meter pit installed during the project.

    Back – Seaford
    New hydrant (red top) installed and old hydrant (blue top) to be replaced.

    Back – Seaford
    City of Bridgeville
    Sign announcing ARRA project in Bridgeville.

    Back – Bridgeville
    Location of the newly installed back-up well.

    Back – Bridgeville
    Soils removed during well installation.

    Back – Bridgeville
    The marked location of the well.

    Back – Bridgeville
    The new backup well.

    Back – Bridgeville
    The newly installed back-up well in Bridgeville.

    Back – Bridgeville
    The area of the newly installed back-up well.

    Back – Bridgeville
    New well completed March 2010.

    Back – Bridgeville
    Completed well with well head protection.

    Back – Bridgeville
    Lock for well head protection.

    Back – Bridgeville